An independent advocacy toolkit for Vermonters — created by residents, not affiliated with the State of Vermont.

Vermont State House in Montpelier, a Greek Revival building with a golden dome, on a clear day
Carol M. Highsmith / Library of Congress

Vermont Community Resource

Vermont almost made Big Tech play by the strongest data-center rules in the country. The Governor said no. Here's how you finish the job — starting today.

Vermont has no giant data center — yet. Our grid is too small for one. Lawmakers passed a bill to stop it: H.727. The Governor said no — by just seven votes. The door is still open. The tools to close it are yours.

The Case
Why this matters to you

What a giant data center would mean for you

A giant data center won't stay in one town. Here's how it touches your life.

The situation

What happened — and what comes next

A classic Vermont covered wooden bridge spanning a stream amid autumn foliage
Carol M. Highsmith / Library of Congress

Legislative timeline

  1. Completed:

    Jan 6, 2026

    S.205 introduced — temporary moratorium on AI data centers >100 MW until 2030-07-01

    Sen. Rebecca White's bill referred to Senate Finance; stalled in committee. The vehicle that moved was H.727. S.205 died at adjournment May 29, 2026.

  2. Completed:

    2026 session

    H.727 passed Senate 26–3

    "VT Sustainable Data Centers Act" — a 20 MW framework (megawatts, or MW, measure electricity demand), plus ratepayer protections, water/PFAS monitoring, and on-site renewables.

  3. Completed:

    2026 session

    H.727 passed House — near-unanimous voice vote

    One of the most decisive data-center votes in any state legislature.

  4. Completed:

    May 28, 2026

    Governor Scott vetoed H.727

    Vermont has no data-center-specific law as a result. H.727 did not become law.

  5. Completed:

    May 29, 2026

    House override failed 83–52 — seven votes short of the 90 needed

    S.205 also died at adjournment the same day. No operative data-center statute exists in Vermont.

  6. Pending:

    Next session

    Revive H.727 — the mandate already exists

    The bill text is ready. The supermajority voted for it once. The job is to close a seven-vote gap.

A vetoed bill and a failed override are not defeat — they are a mandate with a seven-vote gap.

Regulatory landscape

Vermont's regulatory tools — what exists today

Vermont regulatory tools for data-center oversight — scope, data-center coverage, and current status
LeverTypeCovers data centers?Status
30 V.S.A. §248Energy — generation & transmissionNo — covers gen/tx infrastructure, not loadActive
Act 250 / Act 181 / S.325Land-use environmental reviewYes — criteria 1 (water), 8 (aesthetics), 9 (energy), 10 (town plan)Active (S.325 updated 2026)
H.727 — 20 MW thresholdData-center-specific PUC frameworkYes — but vetoed May 28, 2026NOT in force
Act 179 / Global Warming Solutions ActClimate — 100% renewable by 2035Indirect — fossil backup directly conflicts with statuteActive
Town Meeting / Zoning (24 V.S.A. §4414 / §4415)Local siting — bylaws & interim rulesYes — conditional use, interim bylaws, moratoriumActive

Four-stage horizontal flow: Petition filed, then PUC Review, then Public Comment period, then Decision.

Vermont §248 Certificate of Public Good process — applies to generation and transmission infrastructure, not to data-center load directly
Environmental context

Water and energy: what the national record shows

A 1941 wind turbine on a Vermont hilltop, an early example of renewable energy infrastructure in the region
U.S. DOE / NREL — public domain

Vermont-specific water-use figures for a hypothetical facility aren't independently corroborated, so we don't state them here as fact.What the national record does confirm:

The contrast

What good looks like: community-first technology

The case against extractive data centers isn't "against technology."It's against technology that takes your community's power, water, and land — giving nothing back and hiding how it works.

The grid

Vermont's grid — the facts

You just read how this could hit your bills and your water. Here are the numbers, with sources. Vermont's grid is small — so one giant facility changes it for everyone.

These figures carry two or more independent sources.They all say the same thing: Vermont's grid is small. Any large new load reshapes it for every ratepayer.

~880 MW

Vermont statewide peak electric demand

Vermont Dept. of Public Service, 2026 Annual Energy Report

+7.5%

GMP rate increase effective Oct 1, 2026

PUC Case 26-0096-TF (confirmed)

~$30M

Estimated grid hookup cost that stopped the St. Albans proposal, 2025

VTDigger, 2026-02-24

~5 MW

Vermont's current total data-center electric load — three small Chittenden Co. facilities

VTDigger, 2026-02-24 · Vermont Public

One campus vs. the entire state — a scale comparison
One campus vs. the entire state — a scale comparison
CategoryValue (MW)
VT current data-center load (~5 MW)5
Single large hyperscale campus (illustrative — 100s of MW typical)300
Vermont statewide peak demand (~880 MW)880

Vermont statewide peak: Vermont Dept. of Public Service, 2026 Annual Energy Report. Current VT data-center load (~5 MW): VTDigger, 2026-02-24. Single hyperscale campus figure (300 MW) is ILLUSTRATIVE — large AI campus interconnection requests have ranged from 100 MW to 500+ MW nationally; no specific facility is represented.

Action Playbooks

Nine ways to act — ordered from easiest to most sustained

Each playbook is a real out-of-state win, re-aimed to a Vermont mechanism. Start at Playbook 1. Each step makes the next one easier.

At a glance

Compare all nine tactics

Each row is a full playbook below. Find your entry point, then read the card.

Nine playbooks comparison — effort level, timeline, and who each tactic is best suited for
#TacticEffortTimelineBest for
1Email your real decision-makerLow10 minAny resident
2Write a Letter to the Editor naming H.727Low30 minAny resident
3File a Vermont Public Records Act requestLow~1 hourAny resident
4Show up at Town Meeting and warn an articleMediumDays–weeksA small core team
5Ask your selectboard to adopt an interim bylawMediumWeeksOrganizers with board relationship
6Write data centers into your town's zoningMediumMonthsOrganizers + Planning Commission
7Take party status in Act 250 reviewHighMonthsCommitted resident or org
8Intervene in the PUC §248 docketHighMonthsOrganizers; counsel helpful
9Revive H.727 — campaign for re-introductionHighSession-longOrganized coalition
Playbooks 1–9

The nine playbooks

Playbook 1:

Email your real decision-maker

10 min

In other states, one constituent email proving "I'm a local voter and I'm watching" moved officials to take a public position.

Vermont steps

  1. Find your decision-maker

    Use legislature.vermont.gov/people to get your House Rep and Senator (for H.727 revival). Use sos.vermont.gov/elections/town-clerks to find your town clerk (for local siting).

  2. Aim your email at the right body

    1. State policy ask (revive H.727) → email your legislators.
    2. Local siting matter → email the town clerk, Planning Commission, or Development Review Board — not your legislator. The town body decides siting, not Montpelier.
  3. Use the Vermont-aimed template on the Actions page

    Add one sentence in your own words. Include your town and ZIP to prove you're a constituent. Then send.

Playbook 2:

Write a Letter to the Editor naming H.727

30 min

Letters to the editor are the cheapest earned-media lever — they reach decision-makers and neighbors at once.

Vermont steps

  1. Pick one point

    For example: "The Governor's veto left Vermont with no data-center law." One clear argument lands harder than three.

  2. Write 150–200 words

    1. Open with why a neighbor should care.
    2. Tie it to a recent VTDigger, Vermont Public, or local paper article for placement odds.
    3. Name your target: your legislator (revive H.727) or your selectboard (adopt interim bylaws).
  3. Submit to the opinion editor

    Email the opinion editor. Paste in the body — do not attach a file. Find a ready-to-customize template on the Actions page.

Playbook 3:

File a Vermont Public Records Act request

~1 hour · template provided

In Wisconsin, public-records law forced Microsoft to disclose water-use data it had claimed as a trade secret. Opacity broke under the law.

Vermont steps (1 V.S.A. §§315–320)

  1. Identify the records officer

    Town clerk for local records. Agency records officer for state agency records.

  2. Email a short, specific request

    Name the records and date range. Cite the Vermont Public Records Act, 1 V.S.A. §§315–320. Use the copy-paste template on the Actions page.

  3. Track the clock

    1. Substantive response required within 3 business days.
    2. Any extension must be in writing and is limited to 10 additional business days.
  4. Challenge "trade secret" withholding

    If energy or water data is withheld as a trade secret under §317(c)(9), demand segregation and release of non-exempt portions plus the specific factual basis. A bare "trade secret" label is not self-executing.

  5. Appeal if denied

    Appeal in writing to the agency head (5-business-day decision), then Superior Court. The agency bears the burden; attorney's fees are recoverable if you substantially prevail.

Playbook 4:

Show up at Town Meeting and warn an article

Days to weeks

A local body in DeKalb County, Georgia passed a 100-day moratorium to study a project. Vermont has a stronger tradition: Town Meeting direct democracy backed by statute.

Vermont steps (Vermont has no operative county government — go to your town)

  1. Contact your town clerk

    The town clerk keeps the warnings and identifies the Selectboard, Planning Commission, and Development Review Board.

  2. Force an article onto Town Meeting yourself

    1. Draft the article text.
    2. Collect signatures from 5% of registered voters — name, signature, and address.
    3. File with the town clerk at least 47 days before the meeting (17 V.S.A. §2642).
  3. Turn out neighbors to decide it on the floor

    Organize carpools, reminders, and a clear "ask" for the meeting.

Playbook 5:

Ask your selectboard to adopt an interim bylaw

Weeks · the Vermont moratorium

A moratorium buys time to write real rules before a developer can lock in approvals under existing zoning.

Vermont steps (24 V.S.A. §4415)

  1. Ask the Selectboard — not a citizen petition

    Ask the Selectboard to adopt an interim bylaw under 24 V.S.A. §4415. This is a board action, not a direct citizen petition.

  2. Pair it with a planning study request

    §4415 requires an active planning effort. Ask the board to simultaneously commission a data-center planning study or bylaw update.

  3. Turn residents out for the public hearing

    The board adopts after one warned public hearing. Your job: fill that room.

  4. Use the window to push permanent bylaws

    The interim bylaw lasts up to 2 years (plus a 1-year extension). Use that window to drive permanent data-center bylaws through §4441/§4442.

Playbook 6:

Write data centers into your town's zoning

Months

Prince William County, Virginia passed zoning that confined data centers to industrial-zoned areas only.

Vermont steps (24 V.S.A. §4414(3))

  1. Bring a proposal to the Planning Commission

    Propose making data centers a conditional use under strict standards — or limit them to an industrial-only district. Under 24 V.S.A. §4414(3), conditional use must not cause undue adverse effect on community-facility capacity, area character, or traffic.

  2. Include Act 250 criteria in the conditional-use standards

    A town may adopt Act 250 criteria into its conditional-use review, adding water, energy, and aesthetics standards.

  3. Testify at warned hearings

    1. Planning Commission warned hearing.
    2. Selectboard adoption hearing.
  4. Know the adoption timeline

    Board adopts (effective 21 days later) or warns it to ballot. To defend a board-adopted bylaw against repeal, know the §4442 process.

Playbook 7:

Take party status in Act 250 review

Months

Act 250 is a statewide environmental review where residents can question, rebut, and appeal a large project — but through party status, not open online comment.

Vermont steps

  1. Watch for the public notice for your district

    Find your District Environmental Commission (one of nine) at act250.vermont.gov.

  2. File a Party Status Petition before the deadline

    Name the specific criteria you'll contest: Criterion 1 (water pollution), Criterion 8 (aesthetics/light), Criterion 9 (energy/soils), Criterion 10 (town/regional-plan conformance).

  3. Participate in the hearing fully

    Present evidence, cross-examine witnesses, and keep your party status to the end to preserve appeal rights.

  4. Appeal if aggrieved

    Appeal within ~30 days to the Environmental Division (de novo review, your criteria only). Engaging your Regional Planning Commission and town Planning Commission early is critical — they are automatic parties and Criterion 10 turns on their plans.

Playbook 8:

Intervene in the PUC §248 docket for power infrastructure

Months · counsel helpful

The data-center building goes through Act 250 and zoning. The dedicated power infrastructure — a substation, line, or on-site generation — triggers PUC §248 review (30 V.S.A. §248). That's where the ratepayer-cost argument goes on the record.

Vermont steps

  1. Find the docket

    Go to puc.vermont.gov → Public Participation → ePUC. Search by company, town, or case number.

  2. Watch the scheduling order for the intervention deadline

    The petitioner must give 45-day advance notice. The scheduling order sets the intervention deadline.

  3. Attend the public hearing

    Public comment at PUC hearings requires no party status. Show up in the host community.

  4. File a motion to intervene for full party status

    File through ePUC before the deadline, stating your stake: abutter, environmental interest, or ratepayer.

  5. Lean on the Department of Public Service and ANR

    Both are automatic parties. Put the ratepayer-cost and environmental arguments to them — they can carry the analysis with far more staff capacity.

Playbook 9:

Revive H.727 — put the mandate back to a vote

A session-long campaign

The policy already commands the votes. It passed both chambers once. The bill text exists. The job is to re-introduce it next session and close the gap.

Vermont steps

  1. Build a coalition

    CLF, VNRC, VPIRG, town officials — small core team, clear goal, public meetings.

  2. Ask your legislators to re-introduce H.727's framework next session

    1. ~20 MW trigger for PUC review of the data center itself.
    2. PUC-approved large-load equity contract insulating ratepayers from infrastructure costs.
    3. Quarterly public reporting of energy and water use.
    4. Limits on fossil-fuel backup generation.
    5. On-site renewables requirement.
    6. Closed-loop cooling and PFAS monitoring.
    7. Public Records Act carve-out so energy and water data cannot hide behind "trade secret."
  3. Route to the right committees

    House Energy & Digital Infrastructure / Senate Natural Resources & Energy (heard H.727), Government Operations (records carve-out), Ways & Means (incentives).

  4. In testimony, cite the demonstrated supermajority

    Senate 26–3, near-unanimous House. Only the override math (83 of 90 votes) fell short. The mandate is real.

Next step

Ready to act?

Start with Playbook 1 — a 10-minute email. Use the Actions page to find your decision-makers and copy the template.

Action Tools

Find your decision-makers. Use the templates. Act this week.

Vermont has two chains of decision-makers, depending on what you're asking for. Get the right person. Send the right message.

Step 1

Find your 3 decision-makers

Card 1 — State legislators

Use when: asking for H.727 revival or any state-level change.

Find your House Rep(s) and Senator by town at the Vermont Legislature directory:

Find my legislators →

Returns your House Rep + Senator with email and phone. Use the email template below for the H.727 revival ask.

Card 2 — Town officials

Use when: asking about local siting, interim bylaws, or zoning.

Start with your town clerk.The clerk identifies your Selectboard, Planning Commission, and Development Review Board, and keeps the warnings and records.

Find my town clerk →

Vermont has no operative county government for siting. Never go to a county body — go to your town.

Card 3 — Vermont PUC

Use when: power infrastructure for a data center triggers §248 review.

Find open dockets, scheduling orders, and hearing notices at Vermont Public Utility Commission ePUC:

Vermont PUC dockets →

Public comment at PUC hearings requires no party status. Intervention for full party status requires a motion before the deadline.

Step 2

Email templates — copy, personalize, send

Add one sentence in your own words. Include your town and ZIP to prove you're a constituent. Then send.

Tip: the moment you tap Copy, switch to your email, paste, and send. Acting in one sitting turns reading into a sent message.

Template A — Legislator

Send to your House Rep and Senator via legislature.vermont.gov/people

Subject: Please bring back H.727 — Vermont still has no data-center law

Dear [Representative/Senator Name],

I'm a constituent in [Town], ZIP [#####]. I'm writing because the Legislature passed H.727 this year by an overwhelming, tripartisan margin — 26–3 in the Senate and a near-unanimous House voice vote — and after the Governor's veto, the override fell only about seven votes short. That left Vermont with no data-center-specific law at all, even as federal rules move to fast-track these projects.

Please commit to re-introducing H.727's framework next session: a ~20 MW trigger, a PUC-approved contract that insulates ratepayers from data-center infrastructure costs, public quarterly reporting of energy and water use, limits on fossil-fuel backup, on-site renewables, and water and PFAS protections. Vermonters already pay roughly 28% above the national average for electricity and our grid has little slack — we can't afford to absorb these costs by default.

The votes for this policy already exist. Please help finish the job.

Thank you,
[Name], [Town], Vermont

Template B — Town

Send to your Selectboard and/or Planning Commission

Subject: Data centers and our town — please act before a proposal arrives

Dear [Selectboard / Planning Commission, Town of ____],

I'm a resident of [Town]. Vermont has no data-center-specific law right now, and a single large facility could rival a significant share of the state's entire electric peak (~880 MW, Vermont DPS, 2026). I'm asking our town to get ahead of this while we still can: please (1) consider an interim bylaw under 24 V.S.A. § 4415 paired with a planning study, and (2) review whether our zoning should treat data centers as a tightly-conditioned use or confine them to an industrial district under 24 V.S.A. § 4414(3).

I'd appreciate knowing when this can be warned for a public hearing, and I'll turn out neighbors to support it.

Thank you,
[Name], [Town], Vermont

Template C — LTE

Letter to the Editor (≤200 words)

[Recent local headline] reminds us that Vermont still has no law governing data centers. This isn't for lack of trying: this year our Legislature passed H.727 — one of the strongest data-center bills in the country — by 26–3 in the Senate and a near-unanimous House. The Governor vetoed it, and the override missed by about seven votes. So the protections our own representatives overwhelmingly voted for simply don't exist today.

That matters because Vermonters already pay around 28% more for electricity than the average American, our grid is small enough that one big facility is a system-scale event, and federal rules are now built to fast-track these projects. The St. Albans proposal collapsed in 2025 only because a single grid hookup would have cost about $30 million — our thin grid, not any law, was the brake.

We can fix that. Ask [Legislator] to bring H.727 back next session, and ask our selectboard to study local safeguards now. The votes are there. Let's finish the job.

[Name], [Town]
Step 3

Public Records Act request template (1 V.S.A. §§315–320)

Use this to request energy use, water use, NDAs, and any correspondence between your town and a data-center developer. The Act requires a response within 3 business days. Any extension must be in writing and is limited to 10 additional business days.

To: [Town Clerk / Agency Records Officer], [Municipality/Agency]
Date: [date]

Under the Vermont Public Records Act, 1 V.S.A. §§ 315–320, I request copies of the following public records:

[Specific records — e.g., "all correspondence, applications, memoranda of understanding, and engineering or utility studies between [Town] and any data-center developer or its agents, including any non-disclosure or confidentiality agreements, from [start date] to present."]

Please provide records in electronic form. I understand the Act requires a response promptly — within 3 business days — to produce the records or certify any claimed exemption, with any extension limited to 10 additional business days and stated in writing.

If any portion is withheld as a trade secret under 1 V.S.A. § 317(c)(9), please segregate and release all non-exempt portions and state the specific factual basis for each withheld element. The Act is liberally construed toward disclosure and the agency bears the burden of justifying any withholding.

Please notify me of any fees before incurring them.

Thank you,
[Name], [Town], Vermont — [email/phone]

If denied: appeal in writing to the agency head (5-business-day decision), then Superior Court in your county or Washington County. Attorney's fees are recoverable if you substantially prevail.

1 V.S.A. §§315–320 · §318 (timelines) · §317(c)(9)
Step 4

Your action checklist — step by step

Work through these in order. Each step earns the next.

Commit out loud: tell one person which step you'll finish first. A commitment said to someone else is one you're far more likely to keep.

  1. Find your state legislators

    Go to legislature.vermont.gov/people.

  2. Send Template A to your House Rep and Senator

  3. Find your town clerk

    Go to sos.vermont.gov/elections/town-clerks.

  4. Send Template B to your Selectboard and Planning Commission

  5. Write a 150–200-word Letter to the Editor (use Template C)

    Submit to VTDigger, Seven Days, or your local paper.

  6. File a Public Records Act request

    Request any existing town correspondence with data-center developers.

  7. Attend your next Selectboard or Planning Commission meeting

    Ask when data-center siting will be warned for public discussion.

  8. Bookmark the H.727 bill-status page

    Go to legislature.vermont.gov/bill/status/2026/H.727 and check back each session for its re-introduction.

Live resources

Upcoming events and proceedings

Meeting and hearing dates will be listed here as they're scheduled. Use the official links below to track them directly.

Federal Context

The federal backdrop — and why Vermont's own levers matter more because of it

The usual ways to slow large industrial projects are being weakened at the federal level. That makes Vermont's own tools more important, not less — Act 250, PUC §248 (the state's power-project permit process), Town Meeting, and the push to revive H.727.

Five federal actions affecting Vermont data-center oversight — status and Vermont impact
#Federal actionStatusVermont impact
1CEQ final rule — NEPA implementing regulations rescindedSigned Jan 8, 2026State tools (Act 250, §248) more critical
2FERC §206 show-cause orders to all RTOs/ISOsActive rulemaking — Jun 18, 2026Monitor ISO-NE (RM26-4-000); bypass risk contested
3EO 14318 — 100 MW+ data-center fast-track permittingSigned Jul 23, 2025Federal pre-clearance shortens review window
4Federal funding withheld from Vermont programsVerified — multiple actions$62.5M Solar for All + ~$5.2M DOE + $5M EV frozen
5Dec 11, 2025 AI EO + DOJ AI Litigation Task ForceSigned — reach to siting law untestedBEAD funds conditioned on AI law compliance
Signed / Verified

CEQ final rule — NEPA implementing regulations removed (January 8, 2026)

Active Rulemaking

FERC §206 show-cause orders — large-load / data-center interconnection (June 18, 2026)

Signed / Verified

EO 14318 — "Accelerating Federal Permitting of Data Center Infrastructure" (July 23, 2025)

Signed / Verified

Federal funding withheld from Vermont's clean-energy programs

$62.5M

EPA "Solar for All" grant terminated (August–September 2025)

vtdigger.org · ago.vermont.gov

~$5.2M

DOE cuts to UVM (~$3.4M) and BETA Technologies (~$1.8M)

vtdigger.org

$5M

Burlington EV-charging award frozen

vtdigger.org · cbsnews.com

Reach Legally Untested

Dec 11, 2025 AI Executive Order + DOJ AI Litigation Task Force

Bottom line

What the federal backdrop means for Vermont advocates

Vermont's own levers carry more weight, not less — Act 250, PUC §248, and Town Meeting are Vermont law and do not depend on federal NEPA or permitting timelines.

Highest-leverage actions

  1. Use Vermont's existing review tools now

    Act 250 party status (Playbook 7) and PUC §248 intervention (Playbook 8) are the primary levers for any project with a Vermont footprint. None depend on federal permitting timelines.

  2. Revive H.727 next legislative session

    The bill text is ready. The supermajority voted for it once. Seven votes decide whether Vermont closes the gap — or leaves the door open to the next proposal.

Federal Counterpart — Sanders AI Record

Sen. Bernie Sanders: federal AI data-center legislation in parallel with Vermont's H.727

Senator Bernie Sanders at a Senate HELP Committee hearing on technology and labor policy
U.S. Congress / public domain

Sanders is Ranking Member — the lead senator from the minority party — on the Senate Health, Education, Labor & Pensions (HELP) Committee in the 119th Congress (2025–26). His bill (S.4214) and committee work on AI's labor and energy impacts run parallel to Vermont's H.727. Both target the same 20 MW threshold. Both aim to shield ratepayers, communities, and the grid from the unchecked buildout of AI data centers.

Two parallel rails converging on a shared-goal box. The Federal rail carries S.4214 — the Artificial Intelligence Data Center Moratorium Act, introduced by Sanders and Ocasio-Cortez on 2026-03-25. The Vermont rail carries H.727 — the Vermont 20 MW data-center framework, passed by the legislature, vetoed on 2026-05-28, override attempt failed 83 to 52. Both rails converge on the shared goal: ratepayer protection, grid stability, and community and environmental safeguards.

S.4214 (federal) and H.727 (Vermont) use the same 20 MW threshold and converge on the same protective goals — ratepayer protection, grid stability, and community approval.
Introduced 2026-03-25 · S.4214

"Artificial Intelligence Data Center Moratorium Act" — the direct federal parallel

2025–2026

Sanders AI-accountability record — chronological

  1. Completed:

    Oct 2025

    HELP Committee report: "The Big Tech Oligarchs' War Against Workers"

    As Ranking Member, Sanders released a Senate HELP Committee staff report projecting — as a disputed modeled estimate, not a settled empirical finding — that AI and automation could eliminate nearly 100 million U.S. jobs over the next decade.

  2. Completed:

    2026-03-25

    S.4214 introduced — "Artificial Intelligence Data Center Moratorium Act"

    Filed with House companion by Rep. Ocasio-Cortez. Referred to Senate Commerce, Science & Transportation Committee. Targets the 20 MW threshold — matching Vermont's H.727.

  3. Completed:

    2026-04-16

    Fox News op-ed: "Artificial intelligence is coming for the working class. We must fight back."

    Sanders argued that AI automation's economic displacement requires structural worker and community protections — the direct rationale behind legislation such as S.4214.

  4. Pending:

    2026-06-18

    "American AI Sovereign Wealth Fund Act" proposed — no bill number assigned yet

    Sanders proposed a one-time tax on large AI firms to fund a citizen dividend. No bill number has been assigned as of publication. Do not cite a number.

Artificial intelligence is coming for the working class. We must fight back.

Sen. Bernie Sanders — op-ed title, Fox News, 2026-04-16. The pull quote above is the verbatim published title of the op-ed; the body text of the article was not independently verified and is not quoted here.
Why I built Feed.

Putting the tools in the community's hands

As More Perfect Union’s reporting documents, a small circle of billionaires and tech CEOs is building software that increasingly runs government — a shift the reporting argues answers to shareholders, not voters. Palantir, co-founded by Peter Thiel, markets itself as an “operating system” for government. OpenGov, co-founded by Palantir co-founder Joe Lonsdale, sells budgeting and data systems public agencies run on. In my view — and as that reporting makes the case — these are part of a longer effort the reporting traces to Thiel and his network: replacing accountable, democratic government with privatized, automated, corporate-owned systems.

In my view, this isn’t separate from data centers — it’s the same movement. The reporting connects the same investors backing privatized-government projects to the push for unrestricted data-center growth. Who owns this page’s fight and who owns our digital infrastructure, I’d argue, are the same question.

Feed. is my answer. If AI and data tools are going to reshape how communities get help, communities should own those tools — not rent them from the corporations automating us out of the decision. Feed. is community-owned mutual-aid technology: the capabilities the giants sell to governments, put back in the hands of the people who use them.

The model already exists — it’s called a co-op. Across the country, people are building cooperatively-owned alternatives that cut out the billionaire middleman without cutting quality. As More Perfect Union’s reporting on the cooperative model documents, Drivers Coop Colorado pays its driver-owners two to three times what Uber does on the same ride, at the same or lower fares; and Nebraska ranchers built their own meatpacking plant after a corporate processor left them stranded. It works for technology too — Wikipedia, governed by its own community, has stayed free and community-run for fifteen years, while, in my view, many billionaire-owned platforms have gotten worse. Feed. runs on that principle: co-op-style, community-owned infrastructure we build and govern together — so meeting our own needs never depends on a billionaire.

Background reading: More Perfect Union, “The Master Plan That Peter Thiel Doesn’t Want You To See”; and More Perfect Union, “Big Ideas: Break Up the Multinational Corporate Model.”

When you're ready, take action